Bear Lake Battery Project

Bantrel was retained by Cenvous to complete the EPCM of the Bear Lake Battrery@Project in 2012. This Project@s mandate was to allow for processing of recovered polymer flood emulsion to produce 5000 sm³/d of crude oil product.@The project@consisted of a new processing battery which@separates sales oil from the incoming three phase feed stream.@The battery consists of inlet separation and treating, glycol heating, product and recovered water storage, oily water separation, vapour recovery an

https://www.bantrel.com/projects/bear-lake-battery-project

Coker Fractionator Replacement

EPCM services were provided by Bantrel to replace the existing 5C-9 fractionator tower with a new tower with a run length of 5 years including:@New fractionator towerNew modularized pipe bridge to connect the new fractionator with the base plantEquipment associate with@ additional pumping capacity and coke filtrationPiping systems to/from the new plant and tie-ins to the existing base plantElectrical and instrumentation

https://www.bantrel.com/projects/coker-fractionator-replacement

Concentrate Expansion Project Phase 2

Iron Ore Company of Canada (IOC) was expanding its iron ore concentrator and pellet plant at Labrador City, Newfoundland and Labrador. The expansion involved@a series of coordinated mine-to-port projects designed to grow the facility from 18 million tons per annum (MTPA) of concentrate production to 26 MTPA, with a corresponding increase in pellet production. The Concentrate Expansion Project Phase 2 (CEP2) was the second of three stages in the expansion program, which increased IOC@s annual co

https://www.bantrel.com/projects/concentrate-expansion-project-phase-2

Corner Project

The first phase of Statoil@s Corner project located approximately 120 kilometres south of Fort McMurray, Alberta, has commercial approval for a 40,000 barrel per day facility using steam assisted gravity drainage (SAGD) technology. @ In 2011, Statoil Canada Ltd. awarded Bantrel process study work for this project. The scope of work included five studies to investigate and evaluate design changes and to investigate different operating cases to maximize efficiency while balancing operating expens

https://www.bantrel.com/projects/corner-project

Crude Plant Debottleneck Project

The purpose of this study was to develop a preliminary cost estimate to debottleneck the existing Husky crude unit from 63,000 BPSD to 80,000 BPSD by adding a vacuum tower.@ The aim was to increase the total feed to the unit while maintaining the same feed rate to H-Oil hydroprocessing units from the bottom of the vacuum tower.

https://www.bantrel.com/projects/crude-plant-debottleneck-project

Degassing Upgrade Project

Bantrel was awarded several scoping studies including an autoclave vacuum degassing, start up vacuum pump upgrade, reflux condenser replacement, and PVC resin pneumatic transfer upgrade to increase PVC production rate by increasing PVC resin transfer rates and reducing autoclave degassing period.@ The objective of the studies was to determine the modifications required to increase operating efficiencies with minimum investment.

https://www.bantrel.com/projects/degassing-upgrade-project

Diluent Fractionation

Bantrel was retained by Paramount Resources Ltd. in 2015 to provide Study and DBM services to determine process configuration and feasibility to process Natural Gas Condensates and Light Oils to produce raw distillate and NGL liquids stream products.

https://www.bantrel.com/projects/diluent-fractionation

Elko Compressor Station Project

This project was successfully completed and started up in November 1997.@It involved designing the installation of a gas turbine/compressor unit for ANG@s Elko pipeline compressor station.@The design featured a GE LM1600 gas turbine rated at 19000 HP, equipped with DLE combustion system and a Nuovo Pignone single stage overhung pipeline compressor.Bantrel@s scope of work was to complete engineering design, construction plan development and preparation of multiple construction work packages.@Resp

https://www.bantrel.com/projects/elko-compressor-station-project

Enbridge Liquid Pipelines & Major Projects Alliance

In 2010, Bantrel was engaged to execute front end development and detailed engineering projects at Enbridge stations and terminals across Canada. Since then, multiple core and expansion projects have been completed. Projects Include:Enbridge LP / Kerrobert@ - Southern Lights to PlainsEnbridge LP / Core Sustaining Program - 2012Enbridge LP / Emergency Flow Restriction ProgramEnbridge LP / Edmonton Terminal @ Woodland Receipt Facility

https://www.bantrel.com/projects/enbridge-liquid-pipelines-major-projects-alliance