Pipelines & Terminals

Since 2014, Bantrel has analyzed over 300 transient hydraulic flow paths and has completed transient hydraulic studies for several major terminals@providing projects with niche expertise. From mainline block valves to leak detection improvements and emergency power generation, our skill set and standardized designs have been applied to and incorporated into over 100 locations across Canada. Bantrel has a dedicated and experienced team of engineers that form part of the dynamic/transient analysi

https://www.bantrel.com/markets/energy/midstream/pipelines-terminals

Sustaining Capital Programs

The Bantrel sustaining capital integrated delivery model was created from our long-term Client@relationships, including Imperial Oil, Husky, Suncor and Enbridge. Our processes and procedures@are designed to continually de-risk your project through each phase, providing you with@safe, operable and maintainable facilities based on consistent and predictable results.

https://www.bantrel.com/about-us/execution-excellence/sustaining-capital-programs

Cenovus DRU

In 2020, after successful completion of a Pre-FEED study, Bantrel embarked on a FEED study for the Cenovus Diluent Recovery Unit project, with a similar total installed cost to that anticipated for the Azure project. The facility was being evaluated to remove diluent prior to shipping bitumen by rail in the adjacent Bruderheim terminal and included water treatment units, sour water and acid gas treating and utilities and offsites (included units such as electrical power and distribution systems,

https://www.bantrel.com/projects/cenovus-dru

Metrolinx Ontario Line in Toronto

Bantrel will work with Bechtel as the delivery partner for the Metrolinx@Ontario Line in Toronto, Ontario.@ @@The Ontario Line project includes 15.6kms of rapid transit throughout Toronto, including a mix of elevations and underground tracks which will better connect the communities, and contribute to sustainable growth for the city.@Bantrel is excited to be working with Bechtel and Comtech Group as a member of the Ontario Line Delivery Partner team,@ said Brian Cole, VP Mining, Infrastructure a

https://www.bantrel.com/news/metrolinx-ontario-line-in-toronto

Bantrel Transient Team

What We DoBantrel has created a highly skilled team that offer advanced modelling and a specialized skillset. This team is able to perform engineering services including transient analysis, dynamic analysis and operational upset analysis. In addition to the Edmonton team, Bantrel is able to utilize the experienced engineers at Bechtel as additional resources. Bantrel is able to perform transient analysis on liquid, gas, slurry and multiphase systems. The team can generate inputs to the stress en

https://www.bantrel.com/markets/energy/midstream/pipelines-terminals/bantrel-transient-team

Electrification

Decarbonization by ElectrificationElectrification of facilities is a sustainable alternative for decarbonizing@assets as policies and regulations raise the cost of emissions.Power System Analysis Using ETAP or SKMLoad flow and short circuitMotor startingArc flashProtective relaying and coordinationHarmonic analysisPotential Avenues for ElectrificationReplace turbines (gas or steam) prime movers with motorsReplace steam tracing with electric heat tracing (EHT)Using variable frequency drives (VFDs

https://www.bantrel.com/energy-transition/electrification

Biofuels & Co-Processing

BiofuelsBiofuels provide a pathway to low carbon fuels: one that requires careful contemplation of strategy, feedstock and technology selection. Bantrel has@extensive experience collaborating with, evaluating, and selecting licensors is key in completing the pre-treatment and hydroprocessing stages.Determining the project strategy and evaluating the impacts of feedstock alternatives are crucial to the overall success of the project. Bantrel provides strong front-end engineering expertise, accura

https://www.bantrel.com/energy-transition/biofuels-co-processing

Petro-Canada Edmonton Refinery Turnarounds

As an extension of Bantrel@s work on the@Edmonton Diesel Desulphurization Project, Bantrel was awarded the 2004 turnaround at the@Petro-Canada Edmonton Refinery. In 2004 the turnaround included removal, modification and replacement of pumps and compressors, reactor tray replacement, 654 piping tie-in points, control room and substation modifications, installation of 3,200 LF of new piping. @Subsequently Bantrel was awarded the 2006 turnaround which included installation of 10,000 linear feet of

https://www.bantrel.com/projects/petro-canada-edmonton-refinery-turnarounds

Back to Top