A New Look for Bantrel!

Bantrel is excited to reveal a new and refreshed logo! The clean design and colour addition were created to highlight our commitment to sustainability and our continued Client focus towards energy transition. The Bantrel blue remains as an honour to the strength of our history, while the green represents progression and our future.@@We embrace the forward-looking shift of our branding but recognize that the identity of a company is so much more than colours and a logo. At the core of our brand r

https://www.bantrel.com/news/a-new-look-for-bantrel

Edmonton Diesel Desulphurization (EDD) Project

When the government instituted new ultra-low sulphur diesel (ULSD) regulations, Petro-Canada was required to install a 60,000 barrel per day fixed bed hydroprocessing unit for the production of low sulphur diesel at its Edmonton Refinery. In 2003, the company awarded Bantrel the study, front-end engineering and full EPC services contracts for the Edmonton Diesel Desulphurization (EDD) project. Bantrel@s portion of the scope included the unionfining unit and associated utilities and offsites, inc

https://www.bantrel.com/projects/edmonton-diesel-desulphurization

Gatsuurt FEL-3 Definition Study

Bantrel completed a FEL-3 study for the Leach, Adsorption and Detoxification circuits of Centerra Gold@s Gatsuurt Project in Mongolia. The study was based on an expected total production of 17 million tonnes (Mt) of ore, to be processed at a rate of 5,000 tonnes of ore per day (t/d) at full capacity with an estimated 10-year production life.

https://www.bantrel.com/projects/gatsuurt-fel-3-definition-study

Duke Edwardsport IGCC Project

In November 2007, Duke Energy received approval from the Indiana Utility Regulatory Commission to build a cleaner-coal integrated gasification combined cycle (IGCC) plant at Duke Energy@s former 160-megawatt Edwardsport Station in Knox County, Indiana.The 618-megawatt IGCC facility is one of the cleanest and most efficient coal-fired power plants in the world. It emits less sulfur dioxide, nitrogen oxides and particulates than the plant it replaces @ while providing more than 10 times the amount

https://www.bantrel.com/projects/duke-edwardsport-igcc

Millennium Coker Unit (MCU)

The Millennium Coker Unit (MCU) project was the last stage of development and expansion of the Millennium Upgrader. @The MCU project built onto a previous Millennium Upgrader expansion called the Millennium Vacuum Unit (MVU) Project. The MCU Project installed capacity to upgrade the incremental bitumen feedstock supplied from the Firebag project. This was primarily accomplished by adding a third set of coke drums that enabled the vacuum unit and diluent recovery installed by the MVU Project to

https://www.bantrel.com/projects/millennium-coker-unit

ZEN Graphene

Bantrel is undertaking a new sustainability focused project with ZEN Graphene Solutions, a Canadian owned and based emerging graphene technology company.@ZEN has developed a graphene-based coating that is 99.9% effective against aerobic bacteria, fungi and viruses, including COVID-19. The application has been extended to nitrile gloves, giving front line responders and health care workers additional protection.@Bantrel will be providing detailed engineering for a processing facility to produce t

https://www.bantrel.com/projects/zen-graphene

Zen Graphene

Bantrel is undertaking a new sustainability focused project with ZEN Graphene Solutions, a Canadian owned and based emerging graphene technology company.@ZEN has developed a graphene-based coating that is 99.9% effective against aerobic bacteria, fungi and viruses, including COVID-19. The application has been extended to nitrile gloves, giving front line responders and health care workers additional protection.@Bantrel will be providing detailed engineering for a processing facility to produce t

https://www.bantrel.com/zengraphene

AOSD – Cogen Facility

Bantrel provided EPCM services for the Athabasca Oil Sands Downstream (AOSD) Project@s Cogeneration Facility. Bantrel@s scope of work included a GE Frame 7EA DLN Gas Turbine Generator with Alstom 90 MW Steam Turbine Generator Model ATP4 - CE500. HRSG HP steam flow 286,269 kg/h at 480oC and 4344 kPa (g) with duct firing.@Total capacity 180 MW. @ The cogeneration facility was developed as an integral part of the Utility and Offsites for the grassroots Upgrader being built adjacent to Shell@s exi

https://www.bantrel.com/projects/athabasca-oil-sands-downstream-project-–-cogenerat

Knowledge Sharing

Through 26 separate lectures featuring 20 project management specialists, Bantrel is sharing its experience and knowledge with nearly 60 masters-level engineering students at the University of Calgary. Bantrel, past winner of the Schulich School of Engineering Dean@s Award for Corporate Leadership, has partnered with the faculty@s Civil Engineering department to launch its Project Engineering Management course.@ The result spans the entire range of project execution and control, developed and de

https://www.bantrel.com/knowledge-sharing

Back to Top