Construction Management

The Bantrel AdvantageAt Bantrel, Construction Management (CM) is a core strength. The CM team is comprised of seasoned experts and front-line leadership who have experience steering some of the most complex construction jobs in Canada.

https://www.bantrel.com/about-us/services/construction-management

Surmont II Project

The Surmont Phase II project is an important part of ConocoPhillips Canada@s oilsands portfolio. Located in the Athabasca region of northern Alberta, the Surmont SAGD facility currently comprises Surmont Phase I and Surmont Phase II, with the potential for significant future expansions. Surmont Phase I began commercial oil production in October 2007 and Surmont Phase II began production in 2015. The Surmont Phase II project has a nameplate capacity of 118,000 barrels per day and is the largest

https://www.bantrel.com/projects/surmont-ii

Newfoundland Transshipment Terminal Alliance Project

Bantrel was awarded this EPCM project in a single project alliance. The project was constructed at Whiffen Head, Placentia Bay, Newfoundland, approximately 150 km from St. John@s. This was a grassroots facility situated on rock cliffs with no existing infrastructure. The facility comprised complete terminal facilities and a marine loading/offloading jetty. The terminal is designed to handle the storage and transshipment of crude oil from the Hibernia and Terra Nova fields. The facility was const

https://www.bantrel.com/projects/newfoundland-trans-shipment-terminal-alliance-proj

Horizon Oil Sands Project

The Horizon project was a proposed oil sands facility that by 2011 was going to@produce, extract and upgrade 270,000 BPD of dry bitumen to produce 232,000 BPD of synthetic crude oil. The new upgrader was to@include the following complexes:Primary Upgrading, comprised of two diluent recovery units, a vacuum unit and a primary conversion unitSecondary Upgrading, comprised of five separate Hydrotreating / Hydrocracking units plus hydrogen productionSupport units, including a sulphur complexThe Can

https://www.bantrel.com/projects/horizon-oil-sands-project

Cochrane Plant Partnership

Bantrel was retained to complete engineering, procurement, and construction management for the Alberta Natural Gas (ANG) Cochrane Residue Gas Compression Project.@ This project involved installation of two residue gas compressors driven by 40,000 HP aeroderivative gas turbines compressing residue gas from two demethanizer/expander trains.@ The new units were installed in parallel with the existing electric motor driven residue gas compressors.The gas turbines exhaust through a new Heat Recovery

https://www.bantrel.com/projects/cochrane-plant-partnership

Joffre Plant Expansion

Bantrel provided engineering, procurement and construction management (EPCM) services to the offsites infrastructure portion of the Joffre Plant Expansion. The offsites portion@and services were provided in support of the Ethylene III, Polyethylene II, Linear Alpha Olefins plants and a 400 MW cogeneration facility. The Bantrel scope was completed on schedule and started-up in 2000.The scope of work included the following:General Site Services: includes roads and parking, communications and secur

https://www.bantrel.com/projects/joffre-plant-expansion

Bi-Provincial Upgrader Project

The Husky Lloydminster facility located@in Lloydminster, Saskatchewan, upgrades a blend of Cold Lake/Lloydminster heavy crude (12-16 degrees@API) to a light, sweet synthetic crude blend of approximately 38 degrees API.@The plant originally had a capacity of approximately 63,000 BPSD of heavy oil feed, which is upgraded by a combination of low conversion, ebullated bed hydrocracking and delayed coking.Bantrel designed the 10,000 m3/d (63,000 BPD) crude unit and the Secondary Upgrading Units, cons

https://www.bantrel.com/projects/bi-provincial-upgrader-project

Christina Lake Project - Phase 1 & 2

Located near Cold Lake, Alberta, the Christina Lake steam-assisted gravity drainage (SAGD) facility is one of the major oilsands assets held by Cenovus (previously Encana). Bantrel provided front-end and detailed engineering and procurement services for Phase 1B of the Christina Lake Thermal project, which included debottlenecking and expansion with resulting production at the facility doubling from 10,000 to 20,000 barrels per day. Cenovus has since completed several additional expansion phase

https://www.bantrel.com/projects/christina-lake-project-phase-1-2

Sunrise Project

The Sunrise Energy project is a key component of Husky Energy@s oilsands@program. Husky and BP PLC are equal partners in the Sunrise Energy project, with Husky operating Sunrise. The Sunrise Energy project is located 60 kilometres northeast of Fort McMurray, Alberta. The project will produce@200,000 barrels of bitumen per day using steam-assisted gravity drainage (SAGD) technology. Phase 1 will produce about 60,000 barrels of bitumen per day. In 2012, Bantrel was awarded the design basis memor

https://www.bantrel.com/projects/sunrise-project