AOSD – Cogen Facility
Bantrel provided EPCM services for the Athabasca Oil Sands Downstream (AOSD) Project@s Cogeneration Facility. Bantrel@s scope of work included a GE Frame 7EA DLN Gas Turbine Generator with Alstom 90 MW Steam Turbine Generator Model ATP4 - CE500. HRSG HP steam flow 286,269 kg/h at 480oC and 4344 kPa (g) with duct firing.@Total capacity 180 MW. @ The cogeneration facility was developed as an integral part of the Utility and Offsites for the grassroots Upgrader being built adjacent to Shell@s exi
https://www.bantrel.com/projects/athabasca-oil-sands-downstream-project-–-cogenerat
Knowledge Sharing
Through 26 separate lectures featuring 20 project management specialists, Bantrel is sharing its experience and knowledge with nearly 60 masters-level engineering students at the University of Calgary. Bantrel, past winner of the Schulich School of Engineering Dean@s Award for Corporate Leadership, has partnered with the faculty@s Civil Engineering department to launch its Project Engineering Management course.@ The result spans the entire range of project execution and control, developed and de
Utilities and Offsites
Utilities and Offsites support facilities typically constitute for 20@50 percent of the total installed cost for a project. Bantrel@subject matter experts have the technical and practical expertise in the conceptual design, expansion, and long-range planning of these U@O facilities. Our capabilities include the design and execution of the Utilities and Offsites required for the onsite unit designs, while also having the expertise to troubleshoot and evaluate complex U@O problems of existing faci
https://www.bantrel.com/markets/energy/refining-upgrading/refining-upgrading/utilities-and-offsites
Procurement
Bantrel builds and manages global procurement processes that are tailored to the unique needs of the Client, while delivering@maximum value for their projects. With an annual spend of over $18 billion, Bantrel and Bechtel have the purchasing power to meet the procurement requirements for projects.
Compressor Stations - Jumping Pound & Burnt Timber
Bantrel was retained by Shell to complete engineering, procurement, and construction management@for two Shell compressor station projects.@Shell Canada Jumping Pound Compressor Station - Two-Staging Project@ The Two-Staging Project was one of the compressor station projects executed under the Shell-Bantrel Alliance contract.@The TIC of the project was approximately $15 million, and Bantrel had total EPCM responsibility.The station consisted of two De Laval sour gas compressors driven by General
https://www.bantrel.com/projects/compressor-stations-jumping-pound-burnt-timber
Sarnia Genesis Project
The Genesis Project, awarded to Bantrel in 2003, was a multiyear overhaul of Suncor@s Sarnia refinery. Bantrel provided EPCM services for this $960-million project, the largest desulphurization job in Ontario@s Chemical Valley in 30 years. This included the design, construction, commissioning and start-up of a 44,000 bpsd diesel hydrotreater, common facilities and substation. Bantrel was also responsible for engineering coordination with the sulphur plant and the amine/sour water engineering and
Foster Creek Oil Sands Bitumen Production
Bantrel provided EPCM services for the Christina Lake SAGD (Steam Assisted Gravity Drainage) facility. The Christina Lake project is a three phase SAGD bitumen production project located approximately 170 km south of Fort McMurray. Phase 1 of the project was designed to produce@10,000 BPD of high quality bitumen. Phase 2 and Phase 3 were each@designed to produce an additional 30,000 BPD, bringing the total project to 70,000 BPD. The development of the Christina Lake reserves was@phased to compl
https://www.bantrel.com/projects/foster-creek-oil-sands-bitumen-production
Primrose and Wolf Lake In-Situ Oil Sands
Description of Work Scope: Prepared Study, DBM and EDS for an expansion of the existing Heavy Oil production on the Cold Lake Air Weapons Range to process 4750 m3 of bitumen product per day and to generate 2,500 m3 of 80% quality steam per day. @The DBM also included the field component of the project comprised@well pads and all associated pipelines. The main processing facility included the following:Oil TreatingMain Piperack / Common FacilitiesProduced Water TreatingSalt Cavern DisposalSteam
https://www.bantrel.com/projects/primrose-and-wolf-lake-in-situ-oil-sands-expansion
Arbour Development
Starting June of 2017, Bemac and Nakoda provided construction management, estimating, and coordination expertise on the Carry the Kettle Arbour Redevelopment Project. Construction mobilization commenced in September 2017 under an MSA agreement between Carry the Kettle (CTK)@First Nation and Nakoda. The project was successfully completed in time for the summer 2018 powwow using a craft workforce of 100% local CTK members.@ Scope included the construction of new bleachers with roofs, the Arbour el