Contact Us

Please use the form below to contact us.c-label, label { margin-bottom: 0.1em; } .form-control { margin-bottom: 1.5em; } [type=submit] { font-weight: bold; width: auto; background-color: #f78d2c; color: #ffffff; }

https://www.bantrel.com/contact/contact-us

Taciuk Demonstration Project

Bantrel was retained to perform a study to find the best location for the Taciuk Demonstration Plant (90 ton/hr).@ The scope of work also included the evaluation of the UMATAC cost estimate for this facility, and an estimate of infrastructure costs and operating costs for a four year program (two to build, two to operate).@

https://www.bantrel.com/projects/taciuk-demonstration-project

Jamnagar Refinery Expansion Project

A grassroot refinery, adjacent to the existing refinery, was@designed to provide an additional 580,000 BPSD capacity to the existing Jamnagar Refinery currently supplying 660,000 BPSD at the time.@On completion in 2008, this became the largest refinery in the world. Bechtel@provided@project management, engineering, procurement and construction coordination services for a $6.0 billion project that was designed to increase the overall capacity of the Jamnagar Refinery to 1,200,000 barrels per day

https://www.bantrel.com/projects/jamnagar-refinery-expansion-project

Montreal Heavy Feed Conversion Project

Studies and DBM on a refinery reconfiguration including:Crude and Vacuum columnsCoker UnitRevamp modifications required for existing Isomax, FCCU, UDD, HydrofinerDebottleneck of Utilities and OffsitesProject cancelled prior to completion.@

https://www.bantrel.com/projects/montreal-heavy-feed-conversion-project

Burnaby Refinery Project

Bantrel has provided EPCM services for more than 20 small projects at the Chevron Burnaby refinery.@@ The projects range d in size from very small maintenance projects to the construction of a new iso-octane unit. This particular project was unique due to the physical constraints of the Chevron Burnaby@refinery. Bantrel designed a single fractionator with a feed flash drum instead of two columns. The second factor was the modular design to minimize site construction schedule.@

https://www.bantrel.com/projects/burnaby-refinery-project

Wood River Core Project

The complex is capable of refining 380,000 barrels (60,000 m3) of crude oil per day and is the largest refinery operated by Phillips 66. Oil is supplied from the Gulf of Mexico, Canada, and domestic sources through pipelines. The facility produces 165,000 barrels per day (26,200 m3/d) of gasoline, 90,000 barrels per day (14,000 m3/d) of diesel and jet fuels, as well as other products including asphalt, propane, and chemical feedstocks. A new four-drum coker, part of Wood River Refinery@s Coker

https://www.bantrel.com/projects/wood-river-core-project

Senior Project Manager

The Senior Project Managers (SPM) provide leadership to the EPC disciplines on capital projects included in the program of work and ensures work plans are developed and are aligned with the Project Execution Plan, Project Procedures and project goals for safety, quality, health, environment, regulatory, schedule and cost. The SPM is responsible for interpreting, organizing, executing and coordinating all aspects of EPC work on the project. 

https://www.bantrel.com/careers/opportunities-2/senior-project-manager

Innovative Solutions Launches Video

The vision of Bantrel@s Innovative Solutions is to re-imagine the future through our people. With unique and creative offerings including our own in-house developed app - Bantrel ConX, to 3D, 4D and immersive VR model reviews, to our Cloud Fusion and Ground Cover applications, Bantrel is focused on methods and technologies that compliment and advance the sustainability objectives of our clients.

https://www.bantrel.com/innovativesolutionsvideo

Back to Top